Work Order Duration Calculation
Tool: Code Explainer
Created: 03/24/2024
Prompt
Date_Dif_Order =
VAR Var1 =
CALCULATE (
MIN ( Table1[ActualStartDate] ),
ALLEXCEPT ( Table1, Table1[Work Order] )
)
VAR Var2 =
CALCULATE (
MAX ( Table1[ActualFinishDate] ),
ALLEXCEPT ( Table1, Table1[Work Order] )
)
RETURN
DATEDIFF ( Var1, Var2, DAY )
Code Explanation
The provided code calculates the difference in days between the earliest start date (ActualStartDate
) and the latest finish date (ActualFinishDate
) for each work order in a table.
VAR Statements:
VAR Var1
: Calculates the minimumActualStartDate
for eachWork Order
by utilizing theMIN
function withCALCULATE
andALLEXCEPT
to remove filters except forWork Order
.VAR Var2
: Calculates the maximumActualFinishDate
for eachWork Order
using theMAX
function in a similar manner asVar1
.
RETURN Statement:
- The
RETURN
section uses theDATEDIFF
function to find the difference in days betweenVar1
andVar2
. TheDAY
parameter specifies that the difference should be in days.
- The
Key Concepts
- CALCULATE Function: Modifies the filter context within which the calculation is being performed.
- ALLEXCEPT Function: Preserves the filter on
Work Order
column while removing other filters on the same table (Table1
). - DATEDIFF Function: Calculates the difference between two dates in the specified time unit (in this case, days).
Additional Example
If you want to calculate the difference in hours between Var1
and Var2
instead of days, you can modify the RETURN
statement:
RETURN
DATEDIFF ( Var1, Var2, HOUR )
This adjustment changes the time unit from days to hours for the calculation.
Visual Date Difference Order Logic
Tool: Logic Visualizer
Created: 03/24/2024
Prompt
Date_Dif_Order =
VAR Var1 =
CALCULATE (
MIN ( Table1[ActualStartDate] ),
ALLEXCEPT ( Table1, Table1[Work Order] )
)
VAR Var2 =
CALCULATE (
MAX ( Table1[ActualFinishDate] ),
ALLEXCEPT ( Table1, Table1[Work Order] )
)
RETURN
DATEDIFF ( Var1, Var2, DAY )
Visual Representation of Date_Dif_Order Logic
Pseudocode:
1. Set Date_Dif_Order variable
2. Define Var1 as the minimum Actual Start Date for each Work Order
3. Define Var2 as the maximum Actual Finish Date for each Work Order
4. Calculate the difference in days between Var1 and Var2
5. Return the calculated date difference as Date_Dif_Order
Annotations:
- Date_Dif_Order: Variable to store the calculated date difference.
- Var1: Variable holding the minimum Actual Start Date for each Work Order.
- Var2: Variable holding the maximum Actual Finish Date for each Work Order.
- CALCULATE: Function used to manipulate filter context.
- MIN, MAX: Functions to find the minimum and maximum values.
- ALLEXCEPT: Function to remove filters except for the specified column.
- DATEDIFF: Function to calculate the difference in days between two dates.
More Code Generators
Apache Flink Code GeneratorApache Pig Code GeneratorAzure Data Factory Code GeneratorC/C++ Code GeneratorCouchDB Code GeneratorDAX Code GeneratorExcel Code GeneratorFirebase Code GeneratorGoogle BigQuery Code GeneratorGoogle Sheets Code GeneratorGraphQL Code GeneratorHive Code GeneratorJava Code GeneratorJavaScript Code GeneratorJulia Code GeneratorLua Code GeneratorM (Power Query) Code GeneratorMATLAB Code GeneratorMongoDB Code GeneratorOracle Code GeneratorPostgreSQL Code GeneratorPower BI Code GeneratorPython Code GeneratorR Code GeneratorRedis Code GeneratorRegex Code GeneratorRuby Code GeneratorSAS Code GeneratorScala Code GeneratorShell Code GeneratorSPSS Code GeneratorSQL Code GeneratorSQLite Code GeneratorStata Code GeneratorTableau Code GeneratorVBA Code Generator